Guest House { weeks 21- 26 weeks }

It's been a little over a month since my last guest house update... and figured it was time to snap some photos and write a little blurb about what's been happening with it. Right before Christmas, the hubby started putting in the plumbing lines (for hot and cold water) for the bathroom... and finished it up when his Dad was here for Christmas, to help out. Together, they placed all of the electrical boxes in all necessary spots for county code, as well as mounted the outside barn lights... a water spout was also plumbed for outside the guest house. The next thing that'll need to happen, is laying the wire for the electric... and then trenching. We need to trench to our well, and to our breaker box on our house... so we can then have water and electric. Such an intricate step... but a massive one. Next month, things should start looking a lot more different inside.